ADKO
Engineering is providing analysis and design of Galena
Creek
Arch Bridge
which is the largest cast-in-place concrete arch span, for
construction loads and unusually high wind loads. The bridge and
its false work system needed to be analyzed for various loading
conditions to determine the effective bracing system that can
withstand the high wind loads and minimize the lateral
displacements while providing an efficient design to meet the
tight construction deadlines. Different bracing systems were used
at different locations to overcome specific challenges imposed by
unique sight conditions.


2007
$ 50,000,000
C.C. Myers
Nevada DOT
Different bracing systems were used at different locations to
overcome specific challenges imposed by unique sight conditions.
State of Nevada
|